Project 202 | Primary Bedroom

See the before, design process and finished primary bedroom for Project 202, a welcoming apartment prepared for short-term rental guests.

Project 202 | Primary Bedroom
Image 1 from Project 202 | Primary Bedroom

This short-term rental apartment was love at first sight. Since I toured the spaces, I felt the vibe and intention that the client wanted to achieve.

This apartment tower is located in Los Cacicazgos, Santo Domingo, Dominican Republic and is in the final stage of construction. The apartment has a kitchen, living room, laundry area, WALKING-CLOSET, two bathrooms, jacuzzi, balcony and one bedroom.

In this post I will show you the work we do in the room.

Image 2 from Project 202 | Primary Bedroom

Before intervening in these spaces, the client already had a well-defined style (industrial-modern), so he had already covered some walls with microcement and purchased several of the furniture. Based on this and the client’s personality, we begin to create the design proposal.

In this particular project, I challenged us to work with dark tones and create a truly unique environment. This forced us to step out of our comfort zone and think outside the box to achieve the vision our client had in mind.

Image 3 from Project 202 | Primary Bedroom

To give it that contemporary, masculine and interesting touch, we placed wallpaper on a part of the wall, breaking up the cement texture a bit and turning this section into one of the focal points of the space. We also decided, at the last minute, to cover the niche with microcement to give it more character and unify it with the rest.

Image 4 from Project 202 | Primary Bedroom

From the beginning, I knew we had to create an interesting and eye-catching composition on this wall, since it is the first thing you see when entering the room. In addition, it presents the perfect opportunity to attract the attention of potential clients interested in renting the apartment. After exploring several ideas, we decided to make these hanging shelves with chains ourselves, from scratch.

Image 5 from Project 202 | Primary Bedroom
Image 6 from Project 202 | Primary Bedroom

Click here to see the detailed process on Instagram.

Image 7 from Project 202 | Primary Bedroom

It took us about three days to make and install the shelves. I love that rough touch they give to the space, characteristic of the industrial style.

We paint the chains last. The ideal would have been to paint them before installing the wood, but we had doubts about the adhesion of the paint due to the movement of the chains. After doing extensive research, we found the best option: Tropical Industrial Enamel Paint. I loved this paint because it dries quickly and adheres perfectly to the metal.

HAS CLICK TO ENLARGE THE IMAGES

Image 8 from Project 202 | Primary Bedroom
Image 9 from Project 202 | Primary Bedroom
Image 10 from Project 202 | Primary Bedroom
Image 11 from Project 202 | Primary Bedroom

Details of how the shelf works

Image 12 from Project 202 | Primary Bedroom
Image 13 from Project 202 | Primary Bedroom

HAS CLICK TO ENLARGE THE IMAGES

Image 14 from Project 202 | Primary Bedroom
Image 15 from Project 202 | Primary Bedroom
Image 16 from Project 202 | Primary Bedroom
Image 17 from Project 202 | Primary Bedroom
Image 18 from Project 202 | Primary Bedroom
Image 19 from Project 202 | Primary Bedroom
Image 20 from Project 202 | Primary Bedroom
Image 21 from Project 202 | Primary Bedroom
Image 22 from Project 202 | Primary Bedroom
Image 23 from Project 202 | Primary Bedroom
Image 24 from Project 202 | Primary Bedroom
Image 25 from Project 202 | Primary Bedroom
Image 26 from Project 202 | Primary Bedroom

I must give credit to Thomas, my husband, for making these shelves perfect. Also, I would like to thank our client and friend for trusting and approving all the crazy ideas we came up with. Thank you for your trust and support!

What did you think of this space?